| CURRENT PROJECTS:: |
 |
Carr Resources, Inc. assembled a lease block in the OSR-Halliday (Woodbine) Field in 2009-2010. The play concept was to drill horizontal Woodbine wells to be completed with multiple fracture treatments. Carr joined its acreage with that of Petromax Operating of Garland, Texas to drill the wells. Petromax drilled the first well, the Carr-Ward #1-H and had excellent results with over 400 BOPD for the first several months being produced from a 7,000' lateral. This proof of concept well led to the drilling of the Carr-Cannon #1-H, the Carr-Coleman #1-H and kicked off the play in the OSR-Halliday area. Other operators then joined the drilling boom for the Woodbine with multiple successful wells being drilled. Petromax has now drilled seven wells on the Carr acreage and these wells have ranged from 200 - 700 BOPD of production. There is room on the Carr acreage to drill at least seven more development wells. This project will lead to the drilling of scores of horizontal Woodbine wells in the area and provide a new oil resource for the county, Texas and the country that will run into the millions of barrels. This play was based on the combination of the relatively new technologies of accurate horizontal drilling, new casing and packer technologies, and multiple fracture treatments. Carr is currently leasing a new play to employ its experience gained in the OSR Woodbine play to develop new oil reserves.
CLICK HERE to read this entire Project Article |
 |